MARC details
000 -LEADER |
fixed length control field |
02511nam a22003257a 4500 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
OSt |
005 - DATE AND TIME OF LATEST TRANSACTION |
control field |
20200907103557.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
200907b ||||| |||| 00| 0 eng d |
040 ## - CATALOGING SOURCE |
Transcribing agency |
ACKU |
041 ## - LANGUAGE CODE |
Language code of text/sound track or separate title |
eng |
043 ## - GEOGRAPHIC AREA CODE |
Geographic area code |
a-af--- |
050 00 - LIBRARY OF CONGRESS CALL NUMBER |
Classification number |
Pamphlet GE320. |
Item number |
A33. |
Class number |
E357 2015 |
245 00 - TITLE STATEMENT |
Title |
Environmental and social management plan : |
Remainder of title |
first segment (23.7 KMs) of the Bamyan-Baghlan highway rehabilitation, Afghanistan / |
Statement of responsibility, etc |
Islamic Republic of Afghanistan, Ministry of Public Works. |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) |
Place of publication, distribution, etc |
[Afghanistan] : |
Name of publisher, distributor, etc |
Ministry of Public Works, |
Date of publication, distribution, etc |
2015. |
300 ## - PHYSICAL DESCRIPTION |
Extent |
viii, 83 pages : |
Other physical details |
color illustrations, color maps ; |
Dimensions |
30 cm. |
500 ## - GENERAL NOTE |
General note |
Cover title.<br/>“SFG1340”—cover page.<br/>“September 2015 version”—cover page.<br/>“Public Disclosure Authorized”—cover page.<br/>“Islamic Republic of Afghanistan, Ministry of Public Works”—at head of title.<br/> |
505 ## - FORMATTED CONTENTS NOTE |
Formatted contents note |
Contents: Environmental and social mitigation measures—1. Project background—2. Description of project location (first segment 23.7 Km)—3. Baseline condition of first segment 23.7 Km—4. Potential environmental and social impact—5. Public consultation—6. Environmental and social mitigation management plan—Appendixes. |
520 ## - SUMMARY, ETC. |
Summary, etc |
Summary: “Trans-Hindukush Road Connectivity Project, a part of which is the Bamyan to Baghlan (B2B) highway is an alternative route to the Salang highway which gets closed frequently due to weather related disruptions and maintenance works. The Bamyan to Baghlan Highway Road as a National Highway requires a high level of service because of its strategic importance in providing an alternate route from Kabul going northern part of the country. It will allow traffic to avoid the Salang Corridor, which subjects all north and south bound traffic to considerable time delays during the winter months…”—(page summary). |
546 ## - LANGUAGE NOTE |
Language note |
English |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
Topical term or geographic name as entry element |
Environmental management – Afghanistan. |
|
Topical term or geographic name as entry element |
Environmental assessment – Afghanistan. |
|
Topical term or geographic name as entry element |
Environmental protection – Afghanistan. |
|
Topical term or geographic name as entry element |
Rural development – Afghanistan. |
|
Topical term or geographic name as entry element |
Water resources development – Afghanistan. |
|
Topical term or geographic name as entry element |
Humanitarian assistance – Afghanistan. |
651 #0 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME |
Geographic name |
Afghanistan – Environmental conditions. |
|
Geographic name |
Afghanistan – Politics and government – 2001-. |
856 ## - ELECTRONIC LOCATION AND ACCESS |
Electronic format type |
PDF |
Uniform Resource Identifier |
<a href="https://doi.org/10.29171/azu_acku_pamphlet_ge320_a33_e357_2015">https://doi.org/10.29171/azu_acku_pamphlet_ge320_a33_e357_2015</a> |
Public note |
Scanned for ACKU. |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Source of classification or shelving scheme |
Library of Congress Classification |
Koha item type |
Environment |
Call number prefix |
azu_acku_pamphlet_ge320_a33_e357_2015 |