Initial Environmental Examination: AFG: Transport Network Development Investment Program, Tranche 2 (Section 2 of the Bagrami–Khaki Jabbar–Hisarak–Sherzad–Surkhrod Road).
Material type:
- Pamphlet GE300 I53 2012
Item type | Current library | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|
![]() |
Afghanistan Centre at Kabul University | Pamphlet GE300 I53 2012 (Browse shelf(Opens below)) | Available | 3ACKU000480185 |
Browsing Afghanistan Centre at Kabul University shelves Close shelf browser (Hides shelf browser)
“Prepared by the ministry of public works of the Islamic republic of Afghanistan for the Asian development bank (ADB)” – cover page.
Contents: I. Introduction_ II. Description of the project_ III. Description of the environment_ IV. Screening environmental impacts and mitigation measures_ V. Institutional requirements and environmental management and monitoring plans _ VI. Stakeholder consultation and information disclosure_ VII. Findings and recommendations – VIII. Conclusion.
Only the PDF copy is available in the library of ACKU.
English