Draft Initial Environment Examination: Islamic Republic of Afghanistan: North-South Power Transmission Enhancement Project.
Material type:
- HD9502. A47 D73 2013
Item type | Current library | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|
![]() |
Afghanistan Centre at Kabul University | HD9502. A47 D73 2013 (Browse shelf(Opens below)) | Available | 3ACKU000480227 |
Browsing Afghanistan Centre at Kabul University shelves Close shelf browser (Hides shelf browser)
HD1741 1398 66الف اوبه د تېلو او سمندري بندر په بدل کې / | HD2329.I688 2017 Industrial development report 2018 : | HD4826.J336 2015 Human development report 2015 : | HD9502. A47 D73 2013 Draft Initial Environment Examination: Islamic Republic of Afghanistan: North-South Power Transmission Enhancement Project. | HE269.649ک 1390 ترانسپورت و نقش آن در انکشاف تجارت افغانستان / | HE269.692ن 1387 ارزیابی و حل پرابلم های بهره برداری و سازماندهی ترانسپورت مسافر بری شهر کابل / | HE365.A3282هـ ی1340 راهها : وسیله ارتباط سرزمینها و نشر مدنیتها / |
“North-South Power Transmission Enhancement Project (RRP AFG 46392)” – head of cover page.
“Project Number: 46392-001” – cover page.
“Prepared by Fichtner GmbH for Da Afghanistan Breshna Sherkat of the Government of
Afghanistan for onward submission to the Asian Development Bank” – cover page.
Content: 1. Executive summary – 2. Introduction – 3. Institutional and legislative framework – 4. Description of the project – 5. Description of the environment – 6. Screening of environmental impacts and mitigation – 7. Analysis of alternatives – 8. Public consultation and information disclosure – 9. Grievance mechanism – 10. Environmental management plan – 11. Implementation arrangements and capacity building – 12. Overall findings and recommendations – 13. Conclusion— 14. References – 15. Annexes – rapid environmental assessment (rea) checklist.
Only the PDF copy is available in the library of ACKU.
English