000 02109nam a22003017a 4500
999 _c47119
_d47116
003 OSt
005 20200907093733.0
008 200907b ||||| |||| 00| 0 eng d
040 _cACKU
041 _a124
043 _aa-af---
050 0 0 _aGE320.
_bA33.
_cM393 2018
245 0 0 _aMazar IPP transmission line project (from Kodebarq Mazar IPP to existing Sheberghan-Mazar transmission line) :
_bInitial Environmental Examination (IEE) /
_cprepared by Dynamic Vision.
260 _a[Place of publication not identified] :
_b[Publisher not identified],
_c2018.
300 _axiv, 111 pages :
_bcolor illustrations, color maps ;
_c30 cm.
500 _aCover title. “December, 2018”. “Initial Environmental Examination”—at head of title. “Public Disclosure Authorized”—cover page.
504 _6Includes bibliographical references.
520 _aSummary: “The Mazar Independent Power Plant (IPP) construction is supported by International Finance Corporation (IFC) and investment from the private sector. The gas powered plant will have the capacity of 50 megawatts (MW) and is expected to provide electricity to around 1 million people in the country. The Mazar IPP is going to be the first project in the energy generation involving the private sector. The project will use domestic natural gas resources in the north of the country to generate affordable electricity. Furthermore, this project will pave way for larger cooperation between the government and the private sector in the country to develop key infrastructures…”—(page ii, summary).
546 _a124
650 0 _aEnvironmental management – Afghanistan.
650 0 _aEnvironmental assessment – Afghanistan.
650 0 _aEnvironmental protection – Afghanistan.
650 0 _aHumanitarian assistance – Afghanistan.
651 0 _aAfghanistan – Environmental conditions.
651 0 _aAfghanistan – Politics and government – 2001-.
856 _qPDF
_uhttps://doi.org/10.29171/azu_acku_ge320_a33_m393_2018
_zScanned for ACKU.
942 _2lcc
_cENVIRONMEN
_kazu_acku_ge320_a33_m393_2018