000 01609nam a22002777a 4500
999 _c47882
_d47879
003 OSt
005 20210504044024.0
008 210504b ||||| |||| 00| 0 eng d
040 _cACKU
041 _a124
043 _aa-af---
050 0 0 _aGE300 I54 2012
245 0 0 _aInitial Environmental Examination: AFG: Transport Network Development Investment Program, Tranche 2 (Paktika Economic Corridor: Sar Hawza to Orgun Road and Rabat to Shkin Road) / Asian Development Bank(ADB).
260 _a[Afghanistan]: [Asian Development Bank(ADB)], 2012.
300 _a[5], 107 pages: illustration, color map, chart; 30 cm.
500 _a“Prepared by the ministry of public works of the Islamic republic of Afghanistan for the Asian development bank (ADB)” – cover page.
500 _aContents: I. Introduction_ II. Description of the project_ III. Description of the environment_ IV. Screening of potential environmental impacts and mitigation measures_ V. Potential environmental enhancement/protection measures_ VI. Institutional requirements and environmental management and monitoring plan_ VII. Public consultation and information disclosure – References.
500 _aOnly the PDF copy is available in the library of ACKU.
546 _a124
650 0 _aEnvironmental assessment.
650 0 _aEnvironmental management.
650 0 _aEnvironmental management – Afghanistan.
650 0 _aEnvironmental management –International cooperation.
856 _qPDF
_uhttps://doi.org/10.29171/acku_ge300_i54_2012
_zScanned for ACKU
942 _2lcc
_cENVIRONMEN
_kacku_ge300_i54_2012